Ship Outfitting

The process that starts with the outfitting and piping of steel-completed blocks and continues through blasting-painting and erection to complete the ship’s hull assembly. Every stage is carried out in full compliance with the design drawings and coating specifications.

Piping & Outfitting Surface Preparation Coating Specification Slipway & Dock
Outfitting Stations

The Ship Outfitting Flow

01

Outfitting Production Station

Where outfitting and pipe fabrication works are completed according to the production drawings prepared by design.

02

Block Outfitting Station

Where products fabricated and surface-prepared at the outfitting production station are mounted in their positions on the block.

03

Blasting & Painting Station

Where blocks with completed outfitting undergo blasting and painting under suitable conditions, according to the coating specification.

04

Erection Station

Where painted, outfitted blocks are joined on the slipway or in the dock to complete the ship’s hull assembly.